Wind generators factory
Unit 2, Building 2, Office 102, Pingxiang - Xingtai city,
Shijimingzhu, Guangchang Road, Hebei, China
 Phone: +86 13333 092 057 Email: iasos@iasos.eu
Traiding Company
Lianglima Pingxiang, Xingtai city,
Hebei, China 054500
Phone: +91 9823 1964 80 Email: coyote@iasos.eu
FF 5, First Floor, 77 Rosemin Arcade,
Aquem, Margao Goa, India 403601
Phone: +91 9823 1964 80 Email: jitendra@agarwalgroupco.com

Company
Products
Parts
Packing
Sales
Prices
Photo Video
Publications
FAQ
History
How to use
Contact us
PRODUCTS
Wind generators
Inverters
Generator base
Braking systems
Turbine base
Electrical equipment
Diffusers
Mechanical equipment
Generators
Tools
Charger Controllers
Instruments
Batteries
Hosting system
BACK PAGE
FIRST PAGE

The wiring of the wind generator must be as shown in the following diagram.
HOW TO CONNECT THE WIND GENERATOR, WIND TURBINE

WIND GENERATOR, WIND TURBINE

Select the location, where you will install the wind turbine, based on your experience and not the portable wind speed meters.
The wind turbine can be relatively easily transported to any other location, even when fully assembled. It is often sufficient the wind generator to place just two meters above the ground to double the power delivered.

Assemble the wind turbine according to the instructions you found in the box, together with the parts.
When assembling, you must have the manual brake active before installing the turbine on the center shaft.
Assembly is preferable at the point where you plan to install the wind generator. If, at the point where you plan to install the wind turbine, assembly's work is dangerous, make sure to buy the rotating trailer C3151 along with the wind generator.
When assembly is complete, do not forget to plug the wind generator into the ground.
If during assembly you find that an accessory does not fit into the holes to be connected, do not modify it in any way. Follow the assembly steps upside down to find out in what previous stage you've made a mistake. The probability that a component is incorrectly processed is zero.

Place the controller, batteries and inverter near the point where the power connection will be made.
From the generator to the controller use a common, flexible, watertight, three-core cable with a cross-section of 2.5mm.
From the controller to the batteries, use a thick flexible cable with a cross section corresponding to the connection distance. Please refer to the controller C8502
Do not forget to connect the fuses to the wiring diagram.
From the batteries to the inverter, use a thick flexible cable with a cross section corresponding to the connection distance.
From the inverter to the consumption, use a common three-pole cable with a cross-section of 2.5mm
Release the brake.

To choose the size of the batteries you need, you need to decide for how many days without wind you want to have stored energy. If for example your consumption is 18kw a day and you want energy stored for two days, the batteries will have to store 36kw.
The best type of battery is OPzS and each battery, in this category, is 2 volts. If you buy 24 such batteries and connect them in series, then the battery pack output will be 48 volts.
If each battery is 1.000 Ah, then the total energy that can be stored is 48 volt x 1.000 Ampere = 48.000 watt. However, from this stored energy only 80% can be used. Therefore, 48.000 watt x 80% = 38.400 watts. In practice, with this level of stored energy, you can cover more than two days without wind because the wind turbine generates energy at very low wind speeds.

To select the size of the inverter you need, you need to calculate the instantaneous maximum power you need (peak consumption).
For example, if you want to use two electrical appliances with very high consumption at the same time, such as the 3 Kw electric oven and one boiler 3 Kw, you need an inverter of 3 + 3 + 2 = 8 Kw.
But if you do not use electrical appliances with very high consumption at the same time and use them gradually during the day, you will need a much smaller inverter and therefore much less money.

During operation, the wind generator must not produce any mechanical noise. Otherwise, you should investigate whether small branches of trees or other small objects come into contact with the moving parts.
If your wind generator model uses chain for power transmission, then every six months you need to lubricate the chain.
The wind turbines of "IASOS" do not need any other maintenance.


The wind generator can cover all our electricity needs, but its use requires ecological consciousness.